Commercial Kitchen Startup Checklist

Restaurant startup checklist

Opening a commercial kitchen requires managing hundreds of details simultaneously. Missing even a few can delay your opening by weeks or cost thousands. This checklist is the result of helping dozens of operators through this process.

Phase 1: Planning (6-9 Months Before Opening)

  • Business plan completed
  • Funding secured
  • Location identified and lease signed
  • Concept finalized
  • Menu developed and costed
  • Equipment list finalized

Phase 2: Design (4-6 Months Before)

  • Kitchen designer engaged
  • Architect hired
  • Floor plan approved
  • Equipment specifications finalized
  • Ventilation design completed
  • Electrical/plumbing plans approved

Phase 3: Permits (3-4 Months Before)

  • Health permit application submitted
  • Building permit submitted
  • Liquor license application (if applicable)
  • Fire department approval
  • Signage permits

Phase 4: Buildout (2-3 Months Before)

  • Contractor hired
  • Construction timeline established
  • Equipment ordered
  • Smallwares ordered
  • Opening inventory planned

Phase 5: Pre-Opening (1 Month Before)

  • Staff hired and training
  • Menu testing
  • Supplier relationships finalized
  • Marketing materials ready
  • Soft opening scheduled